EV charger ducting
Power for the charger.
A route beneath the driveway.
Create a cable-duct crossing beneath your existing driveway or path, from the home supply side to a wall-mounted EV charger or charging post.
Illustrative crossing · working pits and connections are assessed for each site.
A pathway beneath retained surfaces
Rather than opening a trench across the driveway, we work from local access pits and form a straight underground crossing where conditions allow. Your electrician specifies the cable and duct requirements, including capacity, bend limits and entry points.
Duct installation and cable work are separate
The underground duct is one part of the system. Pulling cables, electrical connections, data terminations, testing and commissioning should have clearly agreed responsibilities.
Plan the ends as carefully as the route
Tell us what the duct will serve, the proposed equipment positions, approximate distance and how access is available at each end. Share existing service plans and cable requirements where available.
LET’S TALK UNDERGROUND
Have a route in mind?
Tell us what needs to go underground and where. A postcode, approximate distance and a few photographs are a useful starting point.
