Home  /  EV charger ducting

EV charger ducting

Power for the charger.
A route beneath the driveway.

Create a cable-duct crossing beneath your existing driveway or path, from the home supply side to a wall-mounted EV charger or charging post.

Home supplyExisting driveway retainedEV charger
EV charger ducting beneath a driveway Two small pits sit on opposite sides of the paved driveway. The impact mole travels in a straight line below the retained paving, forming a route for Cable duct beneath the paving. This is an illustrative cross-section, not to scale.
Launch pitCable duct beneath the pavingReceiving pit

Illustrative crossing · working pits and connections are assessed for each site.

A pathway beneath retained surfaces

Rather than opening a trench across the driveway, we work from local access pits and form a straight underground crossing where conditions allow. Your electrician specifies the cable and duct requirements, including capacity, bend limits and entry points.

Duct installation and cable work are separate

The underground duct is one part of the system. Pulling cables, electrical connections, data terminations, testing and commissioning should have clearly agreed responsibilities.

Plan the ends as carefully as the route

Tell us what the duct will serve, the proposed equipment positions, approximate distance and how access is available at each end. Share existing service plans and cable requirements where available.

LET’S TALK UNDERGROUND

Have a route in mind?

Tell us what needs to go underground and where. A postcode, approximate distance and a few photographs are a useful starting point.

Discuss your route